Following successful test results, H+H Siporex decided to include also another LPP pump (LPP-T40) in the process to replace the existing conventional hose pump for their mineral saw dust slurry pumping. In this part of the process, the aicrete elements are cut to the final dimension in a wire-cutting platform. The resulting scrap material drops to a mix tank below where the scrap particles are wetted, turned into a slurry and pumped back to a 27 meter high storage tank.
Operated with an inverter, the LPP-T40 pump is controlled with a level switch in the mix tank. The LPP-T40 empties this 3.5 m2 tank during the sawing process. The specific gravity of the saw dust slurry is between 1.3 – 1.6 and the process requires a flow of 4.5 m3/h.